Ankara - 290 kWp
A solar power plant with a power of 291.72 kWp DC / 250 kWe AC was installed on the roof of the enterprise in Ankara province.
The call letter issuance, design and project design, material supply, installation and acceptance procedures were carried out by our company on a turnkey basis and the power plant was commissioned in 2021.
The plant has 884 solar panels and 3 inverters. The estimated annual energy production of the plant is 342,479 kWh.
Commissioning Date: 2021
Capacity: 291.72 kWp DC/ 250 kWe AC
Scope of Work: Call letter, design and project design, installation and acceptance
General Information
Ankara
290 kWp
342,479 kWh
2021